XactRebuild in mobile
XactRebuild allows users to create rebuild estimates based on the data from an existing water mitigation estimate. For more information on XactRebuild, see [X1 article].
To create a rebuild estimate in mobile, the original estimate must meet the following criteria:
- The estimate has at least two WTR line items.
- The estimate’s profile has XactRebuild enabled.
If the estimate meets these requirements complete the following to create the rebuild estimate:
- Find the estimate in the project list and swipe it left so More and Delete appear.
- Select More.
- From the options that appear, select Create Rebuild Estimate.
- The new estimate is created within the instance but is unassigned. The estimate name is the name of the original with an “R” appended to the end. To open it, return to the cloud list and select it.