Add carpet waste

Updated 1 year ago by Bethany W.

  1. On the Estimate Items tab, add a carpet item.
  2. Click Complete. 15% carpet waste is automatically added to the line item.
  3. Return to the Estimate Items tab. An additional carpet line item is added.
  4. In the Calc column, 1.15 represents the 15% waste. To change the amount of waste, select the item and change the formula.

How Did We Do?


Powered by HelpDocs